News

Eagle Plains Acquires Additional Claims at Ice River Rare Earth (“REE”) Project, Southeastern British Columbia

Cranbrook, B.C., February 9th, 2021: Eagle Plains Resources (TSX-V:EPL) has completed staking activity, adding 141ha to the 2170ha Ice River Project located 45 km east of Golden, British Columbia, Canada.  The property is owned 100% by Eagle Plains (with no underlying royalties) and overlies the Ice River Complex (IRC), recognized as one of the largest and best-preserved alkaline ijolite/syenite/carbonatite complexes in the world and host to occurrences of rare earth elements (REE), niobium (Nb), and precious metals.

Eagle Plains’ Partner Rockridge Resources Commences Airborne Geophysical Program at Knife Lake Copper Project, Saskatchewan

Cranbrook, B.C., February 4th, 2021: Eagle Plains Resources (TSX-V:EPL) has been notified by option partner Rockridge Resources Ltd. (TSX-V: ROCK) (OTCQB: RRRLF) (Frankfurt: RR0) (“Rockridge”) that it has commenced a winter exploration program at the Knife Lake Project located in Saskatchewan, Canada (the “Knife Lake Project” or “Property”).

Eagle Plains Partner SKRR Intersects Significant Gold Mineralization at Olson Gold Project, Northern Saskatchewan

Cranbrook, B.C., February 4th 2021: Eagle Plains Resources Ltd. (TSX-V: “EPL”, “Eagle Plains”) and SKRR Exploration (“SKRR”: CSE) have received analytical results from the first five holes of the 18 hole, 2981m (9,778’) drill program completed in Fall, 2020 on EPL’s 100%-owned Olson property (the “Property).

Eagle Plains Announces Application to Extend Warrant Expiry

Cranbrook, B.C., January 21st, 2021: Eagle Plains Resources Ltd. (TSX-V:EPL) (“EPL” or “Eagle Plains”) has made application to the TSX Venture Exchange for approval and acceptance to amend the term of 4,434,000 outstanding common share purchase warrants priced at $.40 per warrant which were issued in connection with a non-brokered private placement completed in February, 2018. The warrants have a current expiry date of February 7, 2021. 

Eagle Plains to Expand Airborne Geophysical Survey at Dictator Gold Project, Acquires Additional Ground

Cranbrook, B.C., January 19th, 2021: Eagle Plains Resources Ltd. (TSX-V:EPL) (“EPL”, “Eagle Plains”) has received results from an 108 line-km airborne (drone) geophysical survey completed recently on the Dictator Project located 65km east of Vernon, B.C. Eagle Plains holds the exclusive right to earn a 100% interest in the 2578 ha property (details below). 

Eagle Plains Commences Airborne Geophysical Survey at Dictator Gold Project, Southern BC

Cranbrook, B.C., December 10th, 2020: Eagle Plains Resources Ltd. (TSX-V:EPL) (“EPL” or “Eagle Plains”) has mobilized crews to commence a 108 line-km airborne (drone) magnetic geophysical survey on the Dictator Project located 65km east of Vernon, B.C. Eagle Plains holds the exclusive right to earn a 100% interest in the 2079 ha property (details below). MWH Geo-Surveys of Vernon, BC has been contracted to carry out the program. 

Eagle Plain’s Partner SKRR Completes Drilling at Olson Gold Project, Saskatchewan

Cranbrook, B.C., November 17th, 2020: Eagle Plains Resources Ltd. (“EPL”:TSX-V, “Eagle Plains”) is pleased to announce that option partner SKRR Exploration Inc. (TSX-V:“SKRR”) have funded and successfully completed an 18 hole, 2981m (9,778’) drill program on EPL’s 100%-owned Olson property (the “Property).

Drilling Program Commences on Eagle Plains’ Iron Range Gold/Sedex Project, Southeastern B.C.

Cranbrook, B.C., November 2nd, 2020: Eagle Plains Resources Ltd. (TSX-V:EPL) (“Eagle Plains”) has received notice from its option partner (an arm’s length private Alberta company), (the “Company”) that crews have been mobilized to commence drilling activity on Eagle Plains’ 100%-owned Iron Range Project located near Creston, in Southern British Columbia.

Eagle Plains Suspends Drilling at Donna Gold Project, Provides Updates on Olson, Kalum Projects

Cranbrook, B.C., October 16th, 2020: Eagle Plains Resources Ltd. (TSX-V:EPL) (“EPL” or “Eagle Plains”) has suspended drilling activity on its 100%-owned Donna Project located 60km east of Vernon, B.C. due to unseasonal winter conditions and heavy snow.  A recent storm front resulted in a significant and persistent accumulation of heavy snow to the property area which created unsafe conditions for crews accessing the property and resulted in difficulties supplying water to the drill.

Pages

Share